Date of Award

1975

Degree Type

Thesis

Degree Name

Master of Engineering (ME)

Department

Mechanical Design

Supervisor

Professor J.N. Siddall

Abstract

The problem of transporting steel billets from the No. 3 Bloom and Billet Mill to the No. 2 Rob Mill of The Steel Company of Canada is dealt with in this report. An original solution is proposed in the form of amphibious vehicles playing a water route in Hamilton Bay between the two mills.

The following Study will prove the feasibility of such a scheme.